Materials Handling Energy UNIT

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Click Here

Material Managing Power UNIT one
Basic Description
This power unit is created to the fork lift industry, consisting of hugely efficient gear pump, DC motor, guide increase and reduce valve, tank, ect. The up and down motion are controlled by the lever in the manual release valve, which can be equipped with an electric switch to activate the motor. The lowing pace is controlled through the strain compensated flow manage valve.
Particular Notes
one. The duty of this power unit is S3, i.e. thirty seconds on and 270 senconds off.
two. Clean each of the hydraulic components concerned prior to set up of the electrical power unit.
three. Viscosity from the hydraulic oil shoud be 15~46 cst, which ought to also be clean and totally free of impurities, N46 hydraulic oil is recommended .
4. Oil transforming is required following the first 100 operation hours, afterwards as soon as every 3000 hours.
5. The energy unit shown is intended to be mounted horizontally.

Materials Managing Electrical power UNIT two
Common Description
This energy unit attributes energy up gravity down circuit. Activate the commence solenoid to start out the motor to lift the machine. The lowing motion is activated through the solenoid valve with all the lowering pace controlled by the strain compensated movement control valve. Merchandise of this series is often widely used in the sector of logistic products for example fork lift, mini lift table, and so on.
Distinctive Notes
1. The duty of this power unit is S3,i.e.,thirty seconds on and 270 senconds off.
2. Clean the many hydraulic components concerned ahead of mounting the power unit.
three. Viscosity of your hydraulic oil shoud be 15~46 cst,which really should also be clean and free of impurities, N46 hydraulic oil is recommended .
4. Oil transforming is required following the initial one hundred operation hrs,afterwards the moment each 3000 hours.
5. The electrical power unit really should be mounted horizontally.

Tages

disc coupling

As one of leading disc coupling manufacturers, suppliers and exporters of products, We offer disc coupling and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of disc coupling

Recent Posts